Cost Breakdown
Name/Model: Moltke CCL
Technology: Inner Sphere
Tonnage: 75
Configuration: Tracked Combat Vehicle
=================================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (238 pts) 12.0 x 25,000 300,000.00
Internal Structure (Standard) 7.5 x 10,000 (+) 75,000.00 = 375,000.00
Control Components 4 x 10,000 (+) 40,000.00 = 415,000.00
Engine (XL) (20,000 x 300 x 75) / 75 (+) 6,000,000.00 = 6,415,000.00
Turret 3 x 5,000 (+) 15,000.00 = 6,430,000.00
-----------------------------------------------------------------------------------------------------------------
Total Structural Cost 6,430,000.00
=================================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------------
LB 10-X AC 400,000 400,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 800,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 800,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 800,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 800,000.00
Plasma Rifle 260,000 (+) 260,000.00 = 1,060,000.00
Plasma Rifle (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,060,000.00
Plasma Rifle (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,060,000.00
TAG 50,000 (+) 50,000.00 = 1,110,000.00
-----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,110,000.00
=================================================================================================================
Combat Vehicle Cost
-----------------------------------------------------------------------------------------------------------------
Structural Cost 6,430,000.00
Weapons and Equipment Cost (+) 1,110,000.00 = 7,540,000.00
Combat Vehicle Cost Multiplier 1 + (75 / 100) (*) 1.75 = 13,195,000.00
-----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 13,195,000.00
|