Cost Breakdown
Name/Model: ACM Scorpion light tank SCP-E3
Technology: Inner Sphere
Tonnage: 25
Configuration: Tracked Combat Vehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
Armor (Standard) (120 pts) 7.5 x 10,000 75,000.00
Internal Structure (Standard) 2.5 x 10,000 (+) 25,000.00 = 100,000.00
Control Components 1.5 x 10,000 (+) 15,000.00 = 115,000.00
Engine (Light Fusion) (15,000 x 125 x 25) / 75 (+) 625,000.00 = 740,000.00
Turret 0.5 x 5,000 (+) 2,500.00 = 742,500.00
----------------------------------------------------------------------------------------------------------------
Total Structural Cost 742,500.00
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
CASE 50,000 (+) 50,000.00 = 150,000.00
Guardian ECM Suite 200,000 (+) 200,000.00 = 350,000.00
Light PPC 150,000 (+) 150,000.00 = 500,000.00
MagShot Gauss Rifle 8,500 (+) 8,500.00 = 508,500.00
MagShot Gauss Rifle 8,500 (+) 8,500.00 = 517,000.00
MagShot Gauss Rifle (Ammo 50) [Empty Bin] 0 (+) 0.00 = 517,000.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 517,000.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
Structural Cost 742,500.00
Weapons and Equipment Cost (+) 517,000.00 = 1,259,500.00
Combat Vehicle Cost Multiplier 1 + (25 / 100) (*) 1.25 = 1,574,375.00
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 1,574,375.00
|