Cost Breakdown
Name/Model: Mossberg (Adv Ballistics, XL engines, DHS)
Technology: Inner Sphere
Tonnage: 70
Configuration: Biped BattleMech
===============================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------------------
Armor (Standard): (200 pts) 12.5 x 10,000 125,000.00
Internal Structure (Endo Steel): 70 x 1,600 x 1 (+) 112,000.00 = 237,000.00
Myomer (Standard): 70 x 2,000 (+) 140,000.00 = 377,000.00
Engine (XL): (20,000 x 350 x 70) / 75 (+) 6,533,333.33 = 6,910,333.33
Gyro (Standard): 4.0 x 300,000 (+) 1,200,000.00 = 8,110,333.33
Cockpit (Standard): 200,000 (+) 200,000.00 = 8,310,333.33
Life Support: 50,000 (+) 50,000.00 = 8,360,333.33
Sensors: 70 x 2,000 (+) 140,000.00 = 8,500,333.33
Heat Sinks (Double): 13 x 6,000 (+) 78,000.00 = 8,578,333.33
Arm Actuators: 70 x ((100 x 2) + (50 x 0) + (80 x 0)) (+) 14,000.00 = 8,592,333.33
Leg Actuators: 70 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 49,000.00 = 8,641,333.33
-------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 8,641,333.33
===============================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------------------
ER Small Laser 11,250 11,250.00
ER Small Laser 11,250 (+) 11,250.00 = 22,500.00
ER Small Laser 11,250 (+) 11,250.00 = 33,750.00
ER Small Laser 11,250 (+) 11,250.00 = 45,000.00
Large Laser 100,000 (+) 100,000.00 = 145,000.00
Large Laser 100,000 (+) 100,000.00 = 245,000.00
LB 20-X AC 600,000 (+) 600,000.00 = 845,000.00
LB 20-X AC (Ammo 5) [Cluster] [Empty Bin] 0 (+) 0.00 = 845,000.00
LB 20-X AC (Ammo 5) [Empty Bin] 0 (+) 0.00 = 845,000.00
LB 20-X AC (Ammo 5) [Empty Bin] 0 (+) 0.00 = 845,000.00
-------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 845,000.00
===============================================================================================================================
BattleMech Cost
-------------------------------------------------------------------------------------------------------------------------------
Structural Cost: 8,641,333.33
Weapons and Equipment Cost: (+) 845,000.00 = 9,486,333.33
BattleMech Cost Multiplier: 1 + (70 / 100) (*) 1.70 = 16,126,766.67
-------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 16,126,767.00
|