Cost Breakdown
Name/Model: Predator PRDT-0R
Technology: Inner Sphere (Mixed)
Tonnage: 50
Configuration: Biped BattleMech
===================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------
Armor (Standard): (169 pts) 11.0 x 10,000 110,000.00
Internal Structure (Standard): 50 x 400 x 1 (+) 20,000.00 = 130,000.00
Myomer (Standard): 50 x 2,000 (+) 100,000.00 = 230,000.00
Engine (XXL): (100,000 x 350 x 50) / 75 (+) 23,333,333.33 = 23,563,333.33
Gyro (Standard): 4.0 x 300,000 (+) 1,200,000.00 = 24,763,333.33
Cockpit (Standard): 200,000 (+) 200,000.00 = 24,963,333.33
Life Support: 50,000 (+) 50,000.00 = 25,013,333.33
Sensors: 50 x 2,000 (+) 100,000.00 = 25,113,333.33
Heat Sinks (Double): 21 x 6,000 (+) 126,000.00 = 25,239,333.33
Arm Actuators: 50 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 23,000.00 = 25,262,333.33
Leg Actuators: 50 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 35,000.00 = 25,297,333.33
-------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 25,297,333.33
===================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------
Chameleon LPS 600,000 600,000.00
ER PPC (C) 300,000 (+) 300,000.00 = 900,000.00
Null-Signature System 1,400,000 (+) 1,400,000.00 = 2,300,000.00
-------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 2,300,000.00
===================================================================================================================
BattleMech Cost
-------------------------------------------------------------------------------------------------------------------
Structural Cost: 25,297,333.33
Weapons and Equipment Cost: (+) 2,300,000.00 = 27,597,333.33
BattleMech Cost Multiplier: 1 + (50 / 100) (*) 1.50 = 41,396,000.00
-------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 41,396,000.00
|