Cost Breakdown
Name/Model: locust (mk 6) melee
Technology: Inner Sphere
Tonnage: 30
Configuration: Biped BattleMech
====================================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous): (105 pts) 6.0 x 20,000 120,000.00
Internal Structure (Composite): 30 x 1,600 x 1 (+) 48,000.00 = 168,000.00
Myomer (Triple-Strength): 30 x 16,000 (+) 480,000.00 = 648,000.00
Engine (XL): (20,000 x 210 x 30) / 75 (+) 1,680,000.00 = 2,328,000.00
Gyro (XL): 1.5 x 750,000 (+) 1,125,000.00 = 3,453,000.00
Cockpit (Small): 175,000 (+) 175,000.00 = 3,628,000.00
Life Support: 50,000 (+) 50,000.00 = 3,678,000.00
Sensors: 30 x 2,000 (+) 60,000.00 = 3,738,000.00
Heat Sinks (Double): 10 x 6,000 (+) 60,000.00 = 3,798,000.00
Arm Actuators: 30 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 13,800.00 = 3,811,800.00
Leg Actuators: 30 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 21,000.00 = 3,832,800.00
--------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 3,832,800.00
====================================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------------------
Jump Jets 30 x (1 x 1) x 200 6,000.00
Large Vibroblade 750,000 (+) 750,000.00 = 756,000.00
Large Vibroblade 750,000 (+) 750,000.00 = 1,506,000.00
--------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,506,000.00
====================================================================================================================
BattleMech Cost
--------------------------------------------------------------------------------------------------------------------
Structural Cost: 3,832,800.00
Weapons and Equipment Cost: (+) 1,506,000.00 = 5,338,800.00
BattleMech Cost Multiplier: 1 + (30 / 100) (*) 1.30 = 6,940,440.00
--------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 6,940,440.00
|