Cost Breakdown
Name/Model: Bushwacker (Kat- The Sweeper)
Technology: Inner Sphere
Tonnage: 55
Configuration: Biped BattleMech
================================================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous): (184 pts) 10.5 x 20,000 210,000.00
Internal Structure (Endo Steel): 55 x 1,600 x 1 (+) 88,000.00 = 298,000.00
Myomer (Standard): 55 x 2,000 (+) 110,000.00 = 408,000.00
Engine (XL): (20,000 x 330 x 55) / 75 (+) 4,840,000.00 = 5,248,000.00
Gyro (Standard): 4.0 x 300,000 (+) 1,200,000.00 = 6,448,000.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 6,648,000.00
Life Support: 50,000 (+) 50,000.00 = 6,698,000.00
Sensors: 55 x 2,000 (+) 110,000.00 = 6,808,000.00
Heat Sinks (Double): 11 x 6,000 (+) 66,000.00 = 6,874,000.00
Arm Actuators: 55 x ((100 x 2) + (50 x 2) + (80 x 0)) (+) 16,500.00 = 6,890,500.00
Leg Actuators: 55 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 38,500.00 = 6,929,000.00
--------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 6,929,000.00
================================================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------------------------------
C3 Slave 250,000 250,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 330,000.00
ER Small Laser 11,250 (+) 11,250.00 = 341,250.00
ER Small Laser 11,250 (+) 11,250.00 = 352,500.00
LB 10-X AC 400,000 (+) 400,000.00 = 752,500.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 752,500.00
LRM 5 30,000 (+) 30,000.00 = 782,500.00
LRM 5 30,000 (+) 30,000.00 = 812,500.00
LRM 5 (Ammo 24) [Semi-Guided] [Empty Bin] 0 (+) 0.00 = 812,500.00
TAG 50,000 (+) 50,000.00 = 862,500.00
--------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 862,500.00
================================================================================================================================
BattleMech Cost
--------------------------------------------------------------------------------------------------------------------------------
Structural Cost: 6,929,000.00
Weapons and Equipment Cost: (+) 862,500.00 = 7,791,500.00
BattleMech Cost Multiplier: 1 + (55 / 100) (*) 1.55 = 12,076,825.00
--------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 12,076,825.00
|