Cost Breakdown
Name/Model: Fury Command Tank Z
Technology: Clan
Tonnage: 80
Configuration: Tracked Combat Vehicle
=================================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (241 pts) 13.0 x 20,000 260,000.00
Internal Structure (Standard) 8.0 x 10,000 (+) 80,000.00 = 340,000.00
Control Components 4 x 10,000 (+) 40,000.00 = 380,000.00
Engine (Fusion) (5,000 x 320 x 80) / 75 (+) 1,706,666.67 = 2,086,666.67
Turret 1.5 x 5,000 (+) 7,500.00 = 2,094,166.67
-----------------------------------------------------------------------------------------------------------------
Total Structural Cost 2,094,166.67
=================================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System (Ammo 24) [Empty Bin] 0 (+) 0.00 = 100,000.00
CASE 2 x 50,000 (+) 100,000.00 = 200,000.00
ER Small Laser 11,250 (+) 11,250.00 = 211,250.00
Hyper-Assault Gauss 30 500,000 (+) 500,000.00 = 711,250.00
Hyper-Assault Gauss 30 (Ammo 4) [Empty Bin] 0 (+) 0.00 = 711,250.00
Hyper-Assault Gauss 30 (Ammo 4) [Empty Bin] 0 (+) 0.00 = 711,250.00
Hyper-Assault Gauss 30 (Ammo 4) [Empty Bin] 0 (+) 0.00 = 711,250.00
Nova CEWS 1,100,000 (+) 1,100,000.00 = 1,811,250.00
-----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,811,250.00
=================================================================================================================
Combat Vehicle Cost
-----------------------------------------------------------------------------------------------------------------
Structural Cost 2,094,166.67
Weapons and Equipment Cost (+) 1,811,250.00 = 3,905,416.67
Combat Vehicle Cost Multiplier 1 + (80 / 100) (*) 1.8 = 7,029,750.00
-----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 7,029,750.00
|