Cost Breakdown
Name/Model: Weaver WV-10R
Technology: Inner Sphere
Tonnage: 40
Configuration: Hover Combat Vehicle
=======================================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (152 pts) 8.5 x 20,000 170,000.00
Internal Structure (Standard) 4.0 x 10,000 (+) 40,000.00 = 210,000.00
Control Components 2 x 10,000 (+) 20,000.00 = 230,000.00
Lift/Dive Equipment 4 x 20,000 (+) 80,000.00 = 310,000.00
Engine (Fusion) (5,000 x 145 x 40) / 75 (+) 386,666.67 = 696,666.67
Turret 1 x 5,000 (+) 5,000.00 = 701,666.67
-----------------------------------------------------------------------------------------------------------------------
Total Structural Cost 701,666.67
=======================================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
Medium Pulse Laser 60,000 (+) 60,000.00 = 110,000.00
Medium Pulse Laser 60,000 (+) 60,000.00 = 170,000.00
Narc Missile Beacon 100,000 (+) 100,000.00 = 270,000.00
Narc Missile Beacon (Ammo 6) [Homing] [Empty Bin] 0 (+) 0.00 = 270,000.00
Streak SRM 2 15,000 (+) 15,000.00 = 285,000.00
Streak SRM 2 15,000 (+) 15,000.00 = 300,000.00
Streak SRM 2 (Ammo 50) [Empty Bin] 0 (+) 0.00 = 300,000.00
-----------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 300,000.00
=======================================================================================================================
Combat Vehicle Cost
-----------------------------------------------------------------------------------------------------------------------
Structural Cost 701,666.67
Weapons and Equipment Cost (+) 300,000.00 = 1,001,666.67
Combat Vehicle Cost Multiplier 1 + (40 / 50) (*) 1.8 = 1,803,000.00
-----------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 1,803,000.00
|