Cost Breakdown
Name/Model: Shrapnel SPL-4M
Technology: Inner Sphere
Tonnage: 50
Configuration: Tracked Combat Vehicle
========================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------
Armor (Standard) (215 pts) 13.5 x 10,000 135,000.00
Internal Structure (Standard) 5.0 x 10,000 (+) 50,000.00 = 185,000.00
Control Components 2.5 x 10,000 (+) 25,000.00 = 210,000.00
Engine (Fusion) (5,000 x 200 x 50) / 75 (+) 666,666.67 = 876,666.67
Turret 1.5 x 5,000 (+) 7,500.00 = 884,166.67
--------------------------------------------------------------------------------------------------------
Total Structural Cost 884,166.67
========================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------
ER Small Laser 11,250 11,250.00
Streak SRM 4 90,000 (+) 90,000.00 = 101,250.00
Streak SRM 4 90,000 (+) 90,000.00 = 191,250.00
Streak SRM 4 90,000 (+) 90,000.00 = 281,250.00
Streak SRM 4 90,000 (+) 90,000.00 = 371,250.00
Streak SRM 4 (Ammo 25) [Empty Bin] 0 (+) 0.00 = 371,250.00
Streak SRM 4 (Ammo 25) [Empty Bin] 0 (+) 0.00 = 371,250.00
--------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 371,250.00
========================================================================================================
Combat Vehicle Cost
--------------------------------------------------------------------------------------------------------
Structural Cost 884,166.67
Weapons and Equipment Cost (+) 371,250.00 = 1,255,416.67
Combat Vehicle Cost Multiplier 1 + (50 / 100) (*) 1.5 = 1,883,125.00
--------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 1,883,125.00
|