Cost Breakdown
Name/Model: Zhukov Heavy Tank (LB-X)2
Technology: Inner Sphere
Tonnage: 75
Configuration: Tracked Combat Vehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
Armor (Standard) (184 pts) 11.5 x 10,000 115,000.00
Internal Structure (Standard) 7.5 x 10,000 (+) 75,000.00 = 190,000.00
Control Components 4 x 10,000 (+) 40,000.00 = 230,000.00
Engine (Internal Combustion) (1,250 x 225 x 75) / 75 (+) 281,250.00 = 511,250.00
Turret 2.5 x 5,000 (+) 12,500.00 = 523,750.00
----------------------------------------------------------------------------------------------------------------
Total Structural Cost 523,750.00
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 450,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 850,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 850,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 850,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 850,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 850,000.00
SRM 4 60,000 (+) 60,000.00 = 910,000.00
SRM 4 (Ammo 25) [Empty Bin] 0 (+) 0.00 = 910,000.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 910,000.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
Structural Cost 523,750.00
Weapons and Equipment Cost (+) 910,000.00 = 1,433,750.00
Combat Vehicle Cost Multiplier 1 + (75 / 100) (*) 1.75 = 2,509,062.50
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 2,509,063.00
|