Cost Breakdown
Name/Model: Dullahan (FerroLam) A
Technology: Clan (Mixed)
Tonnage: 30
Configuration: Biped BattleMech
=====================================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Lamellor): (105 pts) 7.5 x 35,000 262,500.00
Internal Structure (Endo Steel): 30 x 1,600 x 1 (+) 48,000.00 = 310,500.00
Myomer (RISC Super-Cooled): 30 x 10,000 (+) 300,000.00 = 610,500.00
Engine (XXL): (100,000 x 300 x 30) / 75 (+) 12,000,000.00 = 12,610,500.00
Gyro (Heavy-Duty): 6.0 x 500,000 (+) 3,000,000.00 = 15,610,500.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 15,810,500.00
Life Support: 50,000 (+) 50,000.00 = 15,860,500.00
Sensors: 30 x 2,000 (+) 60,000.00 = 15,920,500.00
Heat Sinks (Double): 10 x 6,000 (+) 60,000.00 = 15,980,500.00
Arm Actuators: 30 x ((100 x 2) + (50 x 0) + (80 x 0)) (+) 6,000.00 = 15,986,500.00
Leg Actuators: 30 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 21,000.00 = 16,007,500.00
---------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 16,007,500.00
=====================================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------------
ER Small Laser 11,250 11,250.00
ER Small Laser 11,250 (+) 11,250.00 = 22,500.00
ER Small Laser 11,250 (+) 11,250.00 = 33,750.00
ER Small Laser 11,250 (+) 11,250.00 = 45,000.00
ER Small Laser 11,250 (+) 11,250.00 = 56,250.00
ER Small Laser 11,250 (+) 11,250.00 = 67,500.00
ER Small Laser 11,250 (+) 11,250.00 = 78,750.00
ER Small Laser 11,250 (+) 11,250.00 = 90,000.00
ER Small Laser 11,250 (+) 11,250.00 = 101,250.00
ER Small Laser 11,250 (+) 11,250.00 = 112,500.00
---------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 112,500.00
=====================================================================================================================
BattleMech Cost
---------------------------------------------------------------------------------------------------------------------
Structural Cost: 16,007,500.00
Weapons and Equipment Cost: (+) 112,500.00 = 16,120,000.00
BattleMech Cost Multiplier: 1 + (30 / 100) (*) 1.30 = 20,956,000.00
---------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 20,956,000.00
|