Cost Breakdown
Name/Model: Laser Turret 55 ERPPC
Technology: Inner Sphere
Tonnage: 55
Configuration: Tracked Combat Vehicle
======================================================================================================
Structural Cost
------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (152 pts) 8.5 x 20,000 170,000.00
Internal Structure (Standard) 5.5 x 10,000 (+) 55,000.00 = 225,000.00
Control Components 3 x 10,000 (+) 30,000.00 = 255,000.00
Engine (Fusion) (5,000 x 55 x 55) / 75 (+) 201,666.67 = 456,666.67
Heat Sinks (Single) 20 x 2,000 (+) 40,000.00 = 496,666.67
Turret 1.5 x 5,000 (+) 7,500.00 = 504,166.67
------------------------------------------------------------------------------------------------------
Total Structural Cost 504,166.67
======================================================================================================
Weapons and Equipment Cost
------------------------------------------------------------------------------------------------------
ER PPC 300,000 300,000.00
ER PPC 300,000 (+) 300,000.00 = 600,000.00
------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 600,000.00
======================================================================================================
Combat Vehicle Cost
------------------------------------------------------------------------------------------------------
Structural Cost 504,166.67
Weapons and Equipment Cost (+) 600,000.00 = 1,104,166.67
Combat Vehicle Cost Multiplier 1 + (55 / 100) (*) 1.55 = 1,711,458.33
------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 1,711,458.00
|