Cost Breakdown
Name/Model: Cheap Tracked Tank Testbed 3080
Technology: Inner Sphere
Tonnage: 50
Configuration: Tracked Combat Vehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (178 pts) 9.0 x 25,000 225,000.00
Internal Structure (Standard) 5.0 x 10,000 (+) 50,000.00 = 275,000.00
Control Components 2.5 x 10,000 (+) 25,000.00 = 300,000.00
Engine (Fuel Cell) (3,500 x 200 x 50) / 75 (+) 466,666.67 = 766,666.67
Heat Sinks (Single) 1 x 2,000 (+) 2,000.00 = 768,666.67
Turret 1.5 x 5,000 (+) 7,500.00 = 776,166.67
----------------------------------------------------------------------------------------------------------------
Total Structural Cost 776,166.67
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
Compartment, Infantry (4 ton) 8 x 0 0.00
LB 10-X AC 400,000 (+) 400,000.00 = 400,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 400,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 400,000.00
LRM 5 30,000 (+) 30,000.00 = 430,000.00
LRM 5 (Ammo 24) [Empty Bin] 0 (+) 0.00 = 430,000.00
Machine Gun 5,000 (+) 5,000.00 = 435,000.00
Machine Gun 5,000 (+) 5,000.00 = 440,000.00
Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 440,000.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 440,000.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
Structural Cost 776,166.67
Weapons and Equipment Cost (+) 440,000.00 = 1,216,166.67
Combat Vehicle Cost Multiplier 1 + (50 / 100) (*) 1.5 = 1,824,250.00
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 1,824,250.00
|