Cost Breakdown
Name/Model: Paladin
Technology: Inner Sphere
Tonnage: 67
Configuration: Tracked Combat Vehicle
=================================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------------
Armor (Hardened) (88 pts) 11.0 x 15,000 165,000.00
Internal Structure (Standard) 7.0 x 10,000 (+) 70,000.00 = 235,000.00
Control Components 3.5 x 10,000 (+) 35,000.00 = 270,000.00
Engine (Light Fusion) (15,000 x 270 x 67) / 75 (+) 3,618,000.00 = 3,888,000.00
Turret 2 x 5,000 (+) 10,000.00 = 3,898,000.00
-----------------------------------------------------------------------------------------------------------------
Total Structural Cost 3,898,000.00
=================================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 450,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 450,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 450,000.00
Light Machine Gun 5,000 (+) 5,000.00 = 455,000.00
Light Machine Gun 5,000 (+) 5,000.00 = 460,000.00
Light Machine Gun 5,000 (+) 5,000.00 = 465,000.00
Light Machine Gun 5,000 (+) 5,000.00 = 470,000.00
Light Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 470,000.00
LRM 5 30,000 (+) 30,000.00 = 500,000.00
LRM 5 (Ammo 24) [Empty Bin] 0 (+) 0.00 = 500,000.00
Plasma Rifle 260,000 (+) 260,000.00 = 760,000.00
Plasma Rifle (Ammo 10) [Empty Bin] 0 (+) 0.00 = 760,000.00
Plasma Rifle (Ammo 10) [Empty Bin] 0 (+) 0.00 = 760,000.00
-----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 760,000.00
=================================================================================================================
Combat Vehicle Cost
-----------------------------------------------------------------------------------------------------------------
Structural Cost 3,898,000.00
Weapons and Equipment Cost (+) 760,000.00 = 4,658,000.00
Combat Vehicle Cost Multiplier 1 + (67 / 100) (*) 1.67 = 7,778,860.00
-----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 7,778,860.00
|