Cost Breakdown
Name/Model: Mackie MSK-9HL
Technology: Inner Sphere
Tonnage: 100
Configuration: Biped BattleMech
=================================================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------------------------
Armor (Standard): (307 pts) 19.5 x 10,000 195,000.00
Internal Structure (Endo Steel): 100 x 1,600 x 1 (+) 160,000.00 = 355,000.00
Myomer (Standard): 100 x 2,000 (+) 200,000.00 = 555,000.00
Engine (Fusion): (5,000 x 300 x 100) / 75 (+) 2,000,000.00 = 2,555,000.00
Gyro (Heavy-Duty): 6.0 x 500,000 (+) 3,000,000.00 = 5,555,000.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 5,755,000.00
Life Support: 50,000 (+) 50,000.00 = 5,805,000.00
Sensors: 100 x 2,000 (+) 200,000.00 = 6,005,000.00
Heat Sinks (Double): 16 x 6,000 (+) 96,000.00 = 6,101,000.00
Arm Actuators: 100 x ((100 x 2) + (50 x 0) + (80 x 0)) (+) 20,000.00 = 6,121,000.00
Leg Actuators: 100 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 70,000.00 = 6,191,000.00
---------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 6,191,000.00
=================================================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
ER Small Laser 11,250 (+) 11,250.00 = 61,250.00
ER Small Laser 11,250 (+) 11,250.00 = 72,500.00
ER Small Laser 11,250 (+) 11,250.00 = 83,750.00
ER Small Laser 11,250 (+) 11,250.00 = 95,000.00
Heavy PPC 250,000 (+) 250,000.00 = 345,000.00
Heavy PPC 250,000 (+) 250,000.00 = 595,000.00
Jump Jets 100 x (3 x 3) x 200 (+) 180,000.00 = 775,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 1,175,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,175,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,175,000.00
---------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,175,000.00
=================================================================================================================================
BattleMech Cost
---------------------------------------------------------------------------------------------------------------------------------
Structural Cost: 6,191,000.00
Weapons and Equipment Cost: (+) 1,175,000.00 = 7,366,000.00
BattleMech Cost Multiplier: 1 + (100 / 100) (*) 2.00 = 14,732,000.00
---------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 14,732,000.00
|