Cost Breakdown
Name/Model: Boxer B0-3R
Technology: Inner Sphere
Tonnage: 70
Configuration: Biped BattleMech
=====================================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------------
Armor (Standard): (217 pts) 14.0 x 10,000 140,000.00
Internal Structure (Endo Steel): 70 x 1,600 x 1 (+) 112,000.00 = 252,000.00
Myomer (Triple-Strength): 70 x 16,000 (+) 1,120,000.00 = 1,372,000.00
Engine (XL): (20,000 x 350 x 70) / 75 (+) 6,533,333.33 = 7,905,333.33
Gyro (Standard): 4.0 x 300,000 (+) 1,200,000.00 = 9,105,333.33
Cockpit (Small): 175,000 (+) 175,000.00 = 9,280,333.33
Life Support: 50,000 (+) 50,000.00 = 9,330,333.33
Sensors: 70 x 2,000 (+) 140,000.00 = 9,470,333.33
Heat Sinks (Double): 11 x 6,000 (+) 66,000.00 = 9,536,333.33
Arm Actuators: 70 x ((100 x 2) + (50 x 0) + (80 x 0)) (+) 14,000.00 = 9,550,333.33
Leg Actuators: 70 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 49,000.00 = 9,599,333.33
---------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 9,599,333.33
=====================================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------------
ER Large Laser 200,000 200,000.00
Flamer 7,500 (+) 7,500.00 = 207,500.00
Flamer 7,500 (+) 7,500.00 = 215,000.00
Flamer 7,500 (+) 7,500.00 = 222,500.00
Flamer (Vehicle) 7,500 (+) 7,500.00 = 230,000.00
Heavy-Duty Pile Driver 100,000 (+) 100,000.00 = 330,000.00
Heavy-Duty Pile Driver 100,000 (+) 100,000.00 = 430,000.00
Targeting Computer 2 x 10,000 (+) 20,000.00 = 450,000.00
---------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 450,000.00
=====================================================================================================================
BattleMech Cost
---------------------------------------------------------------------------------------------------------------------
Structural Cost: 9,599,333.33
Weapons and Equipment Cost: (+) 450,000.00 = 10,049,333.33
BattleMech Cost Multiplier: 1 + (70 / 100) (*) 1.70 = 17,083,866.67
---------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 17,083,867.00
|