Cost Breakdown
Name/Model: Skystrike Space Defense Tank
Technology: Clan (Mixed)
Tonnage: 75
Configuration: Tracked Combat Vehicle
=================================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------------
Armor (Vehicular Stealth) (168 pts) 10.5 x 50,000 525,000.00
Internal Structure (Standard) 7.5 x 10,000 (+) 75,000.00 = 600,000.00
Control Components 4 x 10,000 (+) 40,000.00 = 640,000.00
Engine (Fusion) (5,000 x 150 x 75) / 75 (+) 750,000.00 = 1,390,000.00
Turret 1.5 x 5,000 (+) 7,500.00 = 1,397,500.00
-----------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,397,500.00
=================================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System 100,000 (+) 100,000.00 = 200,000.00
Anti-Missile System (Ammo 24) [Empty Bin] 0 (+) 0.00 = 200,000.00
AP Gauss Rifle 10,000 (+) 10,000.00 = 210,000.00
AP Gauss Rifle (Ammo 40) [Empty Bin] 0 (+) 0.00 = 210,000.00
CASE 3 x 50,000 (+) 150,000.00 = 360,000.00
Combat Vehicle Escape Pod (IS) 10,000 (+) 10,000.00 = 370,000.00
ECM Suite 200,000 (+) 200,000.00 = 570,000.00
HarJel 120,000 (+) 120,000.00 = 690,000.00
HarJel 120,000 (+) 120,000.00 = 810,000.00
HarJel 120,000 (+) 120,000.00 = 930,000.00
HarJel 120,000 (+) 120,000.00 = 1,050,000.00
HarJel 120,000 (+) 120,000.00 = 1,170,000.00
Hyper-Assault Gauss 30 500,000 (+) 500,000.00 = 1,670,000.00
Hyper-Assault Gauss 30 (Ammo 4) [Empty Bin] 0 (+) 0.00 = 1,670,000.00
Hyper-Assault Gauss 30 (Ammo 4) [Empty Bin] 0 (+) 0.00 = 1,670,000.00
Hyper-Assault Gauss 30 (Ammo 4) [Empty Bin] 0 (+) 0.00 = 1,670,000.00
Hyper-Assault Gauss 30 (Ammo 4) [Empty Bin] 0 (+) 0.00 = 1,670,000.00
Targeting Computer 3 x 10,000 (+) 30,000.00 = 1,700,000.00
Vehicular Jump Jets 75 x (2 x 2) x 200 (+) 60,000.00 = 1,760,000.00
-----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,760,000.00
=================================================================================================================
Combat Vehicle Cost
-----------------------------------------------------------------------------------------------------------------
Structural Cost 1,397,500.00
Weapons and Equipment Cost (+) 1,760,000.00 = 3,157,500.00
Combat Vehicle Cost Multiplier 1 + (75 / 100) (*) 1.75 = 5,525,625.00
Environmental Sealing 5,525,625.00 x 0.25 (+) 1,381,406.25 = 6,907,031.25
-----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 6,907,031.00
|