Cost Breakdown
Name/Model: Alacorn Custom Fuel Cell
Technology: Inner Sphere
Tonnage: 95
Configuration: Tracked Combat Vehicle
===============================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------
Armor (Standard) (240 pts) 15.0 x 10,000 150,000.00
Internal Structure (Standard) 9.5 x 10,000 (+) 95,000.00 = 245,000.00
Control Components 5 x 10,000 (+) 50,000.00 = 295,000.00
Engine (Fuel Cell) (3,500 x 190 x 95) / 75 (+) 842,333.33 = 1,137,333.33
Heat Sinks (Single) 1 x 2,000 (+) 2,000.00 = 1,139,333.33
Turret 4.5 x 5,000 (+) 22,500.00 = 1,161,833.33
Power Amplifiers 0.5 x 20,000 (+) 10,000.00 = 1,171,833.33
---------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,171,833.33
===============================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
Gauss Rifle 300,000 (+) 300,000.00 = 400,000.00
Gauss Rifle 300,000 (+) 300,000.00 = 700,000.00
Gauss Rifle 300,000 (+) 300,000.00 = 1,000,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 1,000,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 1,000,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 1,000,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 1,000,000.00
Small Laser 11,250 (+) 11,250.00 = 1,011,250.00
---------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,011,250.00
===============================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------------
Structural Cost 1,171,833.33
Weapons and Equipment Cost (+) 1,011,250.00 = 2,183,083.33
Combat Vehicle Cost Multiplier 1 + (95 / 100) (*) 1.95 = 4,257,012.50
---------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 4,257,012.00
|