Cost Breakdown
Name/Model: Condor (Chemical Laser)
Technology: Inner Sphere (Mixed)
Tonnage: 50
Configuration: Hover Combat Vehicle
==============================================================================================================================
Structural Cost
------------------------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (168 pts) 8.5 x 25,000 212,500.00
Internal Structure (Standard) 5.0 x 10,000 (+) 50,000.00 = 262,500.00
Control Components 2.5 x 10,000 (+) 25,000.00 = 287,500.00
Lift/Dive Equipment 5 x 20,000 (+) 100,000.00 = 387,500.00
Engine (Fuel Cell) (3,500 x 215 x 50) / 75 (+) 501,666.67 = 889,166.67
Heat Sinks (Single) 1 x 2,000 (+) 2,000.00 = 891,166.67
Turret 1.5 x 5,000 (+) 7,500.00 = 898,666.67
------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost 898,666.67
==============================================================================================================================
Weapons and Equipment Cost
------------------------------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
Large Chemical Laser (C) 75,000 (+) 75,000.00 = 125,000.00
Large Chemical Laser (Ammo 10) [Empty Bin] (C) 0 (+) 0.00 = 125,000.00
Large Chemical Laser (Ammo 10) [Empty Bin] (C) 0 (+) 0.00 = 125,000.00
Machine Gun 5,000 (+) 5,000.00 = 130,000.00
Machine Gun 5,000 (+) 5,000.00 = 135,000.00
Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 135,000.00
Medium Chemical Laser (C) 30,000 (+) 30,000.00 = 165,000.00
Medium Chemical Laser (C) 30,000 (+) 30,000.00 = 195,000.00
Medium Chemical Laser (Ammo 30) [Empty Bin] (C) 0 (+) 0.00 = 195,000.00
RISC Advanced Point Defense System 200,000 (+) 200,000.00 = 395,000.00
RISC Advanced Point Defense System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 395,000.00
------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 395,000.00
==============================================================================================================================
Combat Vehicle Cost
------------------------------------------------------------------------------------------------------------------------------
Structural Cost 898,666.67
Weapons and Equipment Cost (+) 395,000.00 = 1,293,666.67
Combat Vehicle Cost Multiplier 1 + (50 / 50) (*) 2 = 2,587,333.33
------------------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 2,587,333.00
|