Cost Breakdown
Name/Model: Pollux 2 ADA Pollux 2 ADA
Technology: Inner Sphere
Tonnage: 75
Configuration: Tracked Combat Vehicle
======================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (123 pts) 7.0 x 20,000 140,000.00
Internal Structure (Standard) 7.5 x 10,000 (+) 75,000.00 = 215,000.00
Control Components 4 x 10,000 (+) 40,000.00 = 255,000.00
Engine (Light Fusion) (15,000 x 225 x 75) / 75 (+) 3,375,000.00 = 3,630,000.00
Turret 3 x 5,000 (+) 15,000.00 = 3,645,000.00
----------------------------------------------------------------------------------------------------------------------
Total Structural Cost 3,645,000.00
======================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------------
Arrow IV System 450,000 450,000.00
Arrow IV System (Ammo 5) [Cluster] [Empty Bin] 0 (+) 0.00 = 450,000.00
Arrow IV System (Ammo 5) [Cluster] [Empty Bin] 0 (+) 0.00 = 450,000.00
Arrow IV System (Ammo 5) [Fuel-Air] [Empty Bin] 0 (+) 0.00 = 450,000.00
Guardian ECM Suite 200,000 (+) 200,000.00 = 650,000.00
Medium Pulse Laser 60,000 (+) 60,000.00 = 710,000.00
Silver Bullet Gauss Rifle 350,000 (+) 350,000.00 = 1,060,000.00
Silver Bullet Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 1,060,000.00
Silver Bullet Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 1,060,000.00
Silver Bullet Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 1,060,000.00
Small Pulse Laser 16,000 (+) 16,000.00 = 1,076,000.00
----------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,076,000.00
======================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------------
Structural Cost 3,645,000.00
Weapons and Equipment Cost (+) 1,076,000.00 = 4,721,000.00
Combat Vehicle Cost Multiplier 1 + (75 / 100) (*) 1.75 = 8,261,750.00
----------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 8,261,750.00
|