Cost Breakdown
Name/Model: Bloody Thorn
Technology: Clan
Tonnage: 40
Configuration: WiGE Combat Vehicle
============================================================================================================
Structural Cost
------------------------------------------------------------------------------------------------------------
Armor (Laser Reflective) (180 pts) 11.5 x 30,000 345,000.00
Internal Structure (Standard) 4.0 x 10,000 (+) 40,000.00 = 385,000.00
Control Components 2 x 10,000 (+) 20,000.00 = 405,000.00
Lift/Dive Equipment 4 x 20,000 (+) 80,000.00 = 485,000.00
Engine (XXL) (100,000 x 285 x 40) / 75 (+) 15,200,000.00 = 15,685,000.00
Turret 0.5 x 5,000 (+) 2,500.00 = 15,687,500.00
------------------------------------------------------------------------------------------------------------
Total Structural Cost 15,687,500.00
============================================================================================================
Weapons and Equipment Cost
------------------------------------------------------------------------------------------------------------
Angel ECM Suite 750,000 750,000.00
AP Gauss Rifle 10,000 (+) 10,000.00 = 760,000.00
AP Gauss Rifle 10,000 (+) 10,000.00 = 770,000.00
AP Gauss Rifle 10,000 (+) 10,000.00 = 780,000.00
AP Gauss Rifle 10,000 (+) 10,000.00 = 790,000.00
AP Gauss Rifle (Ammo 40) [Empty Bin] 0 (+) 0.00 = 790,000.00
AP Gauss Rifle (Ammo 40) [Empty Bin] 0 (+) 0.00 = 790,000.00
CASE 1 x 50,000 (+) 50,000.00 = 840,000.00
TAG 50,000 (+) 50,000.00 = 890,000.00
Vehicular Jump Jets 40 x (5 x 5) x 200 (+) 200,000.00 = 1,090,000.00
------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,090,000.00
============================================================================================================
Combat Vehicle Cost
------------------------------------------------------------------------------------------------------------
Structural Cost 15,687,500.00
Weapons and Equipment Cost (+) 1,090,000.00 = 16,777,500.00
Combat Vehicle Cost Multiplier 1 + (40 / 25) (*) 2.6 = 43,621,500.00
------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 43,621,500.00
|