Cost Breakdown
Name/Model: Enyo Strike Tank PR "Not A Stunt"
Technology: Clan (Mixed)
Tonnage: 55
Configuration: Tracked Combat Vehicle
=========================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Lamellor) (133 pts) 9.5 x 35,000 332,500.00
Internal Structure (Standard) 5.5 x 10,000 (+) 55,000.00 = 387,500.00
Control Components 3 x 10,000 (+) 30,000.00 = 417,500.00
Engine (XXL) (100,000 x 330 x 55) / 75 (+) 24,200,000.00 = 24,617,500.00
Turret 1 x 5,000 (+) 5,000.00 = 24,622,500.00
-------------------------------------------------------------------------------------------------------------------------
Total Structural Cost 24,622,500.00
=========================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------------
Armored Motive System 5.5 x 100,000 550,000.00
CASE 1 x 50,000 (+) 50,000.00 = 600,000.00
Narc Missile Beacon 100,000 (+) 100,000.00 = 700,000.00
Narc Missile Beacon (Ammo 6) [Homing] [Empty Bin] 0 (+) 0.00 = 700,000.00
Narc Missile Beacon (Ammo 6) [Homing] [Empty Bin] 0 (+) 0.00 = 700,000.00
Plasma Rifle (IS) 260,000 (+) 260,000.00 = 960,000.00
Plasma Rifle (Ammo 10) [Empty Bin] (IS) 0 (+) 0.00 = 960,000.00
SRM 6 80,000 (+) 80,000.00 = 1,040,000.00
SRM 6 80,000 (+) 80,000.00 = 1,120,000.00
SRM 6 (Ammo 15) [Narc] [Empty Bin] 0 (+) 0.00 = 1,120,000.00
SRM 6 (Ammo 15) [Narc] [Empty Bin] 0 (+) 0.00 = 1,120,000.00
Supercharger 330 x 10,000 (+) 3,300,000.00 = 4,420,000.00
-------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 4,420,000.00
=========================================================================================================================
Combat Vehicle Cost
-------------------------------------------------------------------------------------------------------------------------
Structural Cost 24,622,500.00
Weapons and Equipment Cost (+) 4,420,000.00 = 29,042,500.00
Combat Vehicle Cost Multiplier 1 + (55 / 100) (*) 1.55 = 45,015,875.00
-------------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 45,015,875.00
|