Cost Breakdown
Name/Model:         Moose Medium Tank
Technology:         Inner Sphere
Tonnage:            50
Configuration:      Tracked Combat Vehicle
========================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------
  Armor (Standard)                    (112 pts) 7.0 x 10,000               70,000.00                    
  Internal Structure (Standard)       5.0 x 10,000             (+)         50,000.00  =       120,000.00
  Control Components                  2.5 x 10,000             (+)         25,000.00  =       145,000.00
  Engine (Fusion)                     (5,000 x 200 x 50) / 75  (+)        666,666.67  =       811,666.67
  Heat Sinks (Single)                 9 x 2,000                (+)         18,000.00  =       829,666.67
  Turret                              1.5 x 5,000              (+)          7,500.00  =       837,166.67
--------------------------------------------------------------------------------------------------------
Total Structural Cost                                                                         837,166.67
========================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------
  Large Laser                         100,000                             100,000.00                    
  Large Laser                         100,000                  (+)        100,000.00  =       200,000.00
  Machine Gun                         5,000                    (+)          5,000.00  =       205,000.00
  Machine Gun (Ammo 100) [Empty Bin]  0                        (+)              0.00  =       205,000.00
  Medium Laser                        40,000                   (+)         40,000.00  =       245,000.00
--------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost                                                              245,000.00
========================================================================================================
Combat Vehicle Cost
--------------------------------------------------------------------------------------------------------
  Structural Cost                                                         837,166.67                    
  Weapons and Equipment Cost                                   (+)        245,000.00  =     1,082,166.67
  Combat Vehicle Cost Multiplier      1 + (50 / 100)           (*)               1.5  =     1,623,250.00
--------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost                                                                   1,623,250.00
 
		 |