Cost Breakdown
Name/Model: VAB Mephisto
Technology: Inner Sphere
Tonnage: 16
Configuration: Wheeled Combat Vehicle
===========================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (32 pts) 2.0 x 25,000 50,000.00
Internal Structure (Standard) 2.0 x 10,000 (+) 20,000.00 = 70,000.00
Control Components 1 x 10,000 (+) 10,000.00 = 80,000.00
Engine (Fuel Cell) (3,500 x 95 x 16) / 75 (+) 70,933.33 = 150,933.33
Heat Sinks (Single) 1 x 2,000 (+) 2,000.00 = 152,933.33
Turret 0.5 x 5,000 (+) 2,500.00 = 155,433.33
-----------------------------------------------------------------------------------------------------------
Total Structural Cost 155,433.33
===========================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
Chassis Modification, Fully Amphibious 2 x 10,000 (+) 20,000.00 = 70,000.00
Thunderbolt 5 50,000 (+) 50,000.00 = 120,000.00
Thunderbolt 5 (Ammo 12) [Empty Bin] 0 (+) 0.00 = 120,000.00
-----------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 120,000.00
===========================================================================================================
Combat Vehicle Cost
-----------------------------------------------------------------------------------------------------------
Structural Cost 155,433.33
Weapons and Equipment Cost (+) 120,000.00 = 275,433.33
Combat Vehicle Cost Multiplier 1 + (16 / 200) (*) 1.08 = 297,468.00
-----------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 297,468.00
|