Cost Breakdown
Name/Model: Termite
Technology: Inner Sphere
Tonnage: 50
Configuration: Tracked Combat Vehicle
========================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------
Armor (Hardened) (64 pts) 8.0 x 15,000 120,000.00
Internal Structure (Standard) 5.0 x 10,000 (+) 50,000.00 = 170,000.00
Control Components 2.5 x 10,000 (+) 25,000.00 = 195,000.00
Engine (Fusion) (5,000 x 250 x 50) / 75 (+) 833,333.33 = 1,028,333.33
Turret 1 x 5,000 (+) 5,000.00 = 1,033,333.33
--------------------------------------------------------------------------------------------------------
Total Structural Cost 1,033,333.33
========================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
MML 3 45,000 (+) 45,000.00 = 95,000.00
MML 3 45,000 (+) 45,000.00 = 140,000.00
MML 3 (Ammo 33) [SRM] [Empty Bin] 0 (+) 0.00 = 140,000.00
MML 3 (Ammo 40) [LRM] [Empty Bin] 0 (+) 0.00 = 140,000.00
Plasma Rifle 260,000 (+) 260,000.00 = 400,000.00
Plasma Rifle (Ammo 10) [Empty Bin] 0 (+) 0.00 = 400,000.00
Plasma Rifle (Ammo 10) [Empty Bin] 0 (+) 0.00 = 400,000.00
TAG 50,000 (+) 50,000.00 = 450,000.00
--------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 450,000.00
========================================================================================================
Combat Vehicle Cost
--------------------------------------------------------------------------------------------------------
Structural Cost 1,033,333.33
Weapons and Equipment Cost (+) 450,000.00 = 1,483,333.33
Combat Vehicle Cost Multiplier 1 + (50 / 100) (*) 1.5 = 2,225,000.00
--------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 2,225,000.00
|