Cost Breakdown
Name/Model: Zohra-Wentlaar (Steel Rhino) Ground defence tank TGT-19/C2
Technology: Clan (Mixed)
Tonnage: 50
Configuration: Tracked Combat Vehicle
==============================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------------
Armor (Standard) (176 pts) 11.0 x 10,000 110,000.00
Internal Structure (Standard) 5.0 x 10,000 (+) 50,000.00 = 160,000.00
Control Components 2.5 x 10,000 (+) 25,000.00 = 185,000.00
Engine (XL) (20,000 x 200 x 50) / 75 (+) 2,666,666.67 = 2,851,666.67
Turret 1.5 x 5,000 (+) 7,500.00 = 2,859,166.67
--------------------------------------------------------------------------------------------------------------
Total Structural Cost 2,859,166.67
==============================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------------
CASE 1 x 50,000 50,000.00
ER Small Laser 11,250 (+) 11,250.00 = 61,250.00
ER Small Laser 11,250 (+) 11,250.00 = 72,500.00
LB 10-X AC 400,000 (+) 400,000.00 = 472,500.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 472,500.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 472,500.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 472,500.00
LRM 10 100,000 (+) 100,000.00 = 572,500.00
LRM 10 (Ammo 12) [Empty Bin] 0 (+) 0.00 = 572,500.00
Machine Gun (IS) 5,000 (+) 5,000.00 = 577,500.00
Machine Gun (IS) 5,000 (+) 5,000.00 = 582,500.00
Machine Gun (IS) 5,000 (+) 5,000.00 = 587,500.00
Machine Gun (Ammo 200) [Empty Bin] (IS) 0 (+) 0.00 = 587,500.00
Machine Gun (Ammo 200) [Empty Bin] (IS) 0 (+) 0.00 = 587,500.00
Machine Gun (Ammo 200) [Empty Bin] (IS) 0 (+) 0.00 = 587,500.00
Small Pulse Laser 16,000 (+) 16,000.00 = 603,500.00
--------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 603,500.00
==============================================================================================================
Combat Vehicle Cost
--------------------------------------------------------------------------------------------------------------
Structural Cost 2,859,166.67
Weapons and Equipment Cost (+) 603,500.00 = 3,462,666.67
Combat Vehicle Cost Multiplier 1 + (50 / 100) (*) 1.5 = 5,194,000.00
--------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 5,194,000.00
|