Cost Breakdown
Name/Model: Toad Support Tank
Technology: Inner Sphere
Tonnage: 50
Configuration: Tracked Combat Vehicle
===============================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (138 pts) 7.0 x 25,000 175,000.00
Internal Structure (Standard) 5.0 x 10,000 (+) 50,000.00 = 225,000.00
Control Components 2.5 x 10,000 (+) 25,000.00 = 250,000.00
Engine (XL) (20,000 x 300 x 50) / 75 (+) 4,000,000.00 = 4,250,000.00
Heat Sinks (Single) 2 x 2,000 (+) 4,000.00 = 4,254,000.00
Turret 1 x 5,000 (+) 5,000.00 = 4,259,000.00
-------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost 4,259,000.00
===============================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------------------
Angel ECM Suite 750,000 750,000.00
Medium Re-engineered Laser 100,000 (+) 100,000.00 = 850,000.00
Medium Re-engineered Laser 100,000 (+) 100,000.00 = 950,000.00
MML 3 45,000 (+) 45,000.00 = 995,000.00
MML 3 45,000 (+) 45,000.00 = 1,040,000.00
MML 3 (Ammo 33) [SRM / Inferno] [Empty Bin] 0 (+) 0.00 = 1,040,000.00
MML 3 (Ammo 33) [SRM / Smoke] [Empty Bin] 0 (+) 0.00 = 1,040,000.00
MML 3 (Ammo 33) [SRM] [Empty Bin] 0 (+) 0.00 = 1,040,000.00
MML 3 (Ammo 40) [LRM / Thunder] [Empty Bin] 0 (+) 0.00 = 1,040,000.00
RISC Advanced Point Defense System 200,000 (+) 200,000.00 = 1,240,000.00
RISC Advanced Point Defense System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 1,240,000.00
-------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,240,000.00
===============================================================================================================================
Combat Vehicle Cost
-------------------------------------------------------------------------------------------------------------------------------
Structural Cost 4,259,000.00
Weapons and Equipment Cost (+) 1,240,000.00 = 5,499,000.00
Combat Vehicle Cost Multiplier 1 + (50 / 100) (*) 1.5 = 8,248,500.00
-------------------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 8,248,500.00
|