Cost Breakdown
Name/Model: DragonKin DkN-3M
Technology: Inner Sphere
Tonnage: 80
Configuration: Tracked Combat Vehicle
===============================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------
Armor (Standard) (240 pts) 15.0 x 10,000 150,000.00
Internal Structure (Standard) 8.0 x 10,000 (+) 80,000.00 = 230,000.00
Control Components 4 x 10,000 (+) 40,000.00 = 270,000.00
Engine (Fusion) (5,000 x 240 x 80) / 75 (+) 1,280,000.00 = 1,550,000.00
Heat Sinks (Single) 6 x 2,000 (+) 12,000.00 = 1,562,000.00
Turret 1 x 5,000 (+) 5,000.00 = 1,567,000.00
---------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,567,000.00
===============================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
Large Laser 100,000 (+) 100,000.00 = 200,000.00
Large Laser 100,000 (+) 100,000.00 = 300,000.00
LRM 10 100,000 (+) 100,000.00 = 400,000.00
LRM 10 100,000 (+) 100,000.00 = 500,000.00
LRM 10 100,000 (+) 100,000.00 = 600,000.00
LRM 10 (Ammo 12) [Empty Bin] 0 (+) 0.00 = 600,000.00
LRM 10 (Ammo 12) [Empty Bin] 0 (+) 0.00 = 600,000.00
---------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 600,000.00
===============================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------------
Structural Cost 1,567,000.00
Weapons and Equipment Cost (+) 600,000.00 = 2,167,000.00
Combat Vehicle Cost Multiplier 1 + (80 / 100) (*) 1.8 = 3,900,600.00
---------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 3,900,600.00
|