Cost Breakdown
Name/Model: Challenger Arrow
Technology: Inner Sphere
Tonnage: 90
Configuration: Tracked Combat Vehicle
========================================================================================================================
Structural Cost
------------------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (355 pts) 18.0 x 25,000 450,000.00
Internal Structure (Standard) 9.0 x 10,000 (+) 90,000.00 = 540,000.00
Control Components 4.5 x 10,000 (+) 45,000.00 = 585,000.00
Engine (XL) (20,000 x 270 x 90) / 75 (+) 6,480,000.00 = 7,065,000.00
Turret 2 x 5,000 (+) 10,000.00 = 7,075,000.00
------------------------------------------------------------------------------------------------------------------------
Total Structural Cost 7,075,000.00
========================================================================================================================
Weapons and Equipment Cost
------------------------------------------------------------------------------------------------------------------------
Arrow IV System 450,000 450,000.00
Arrow IV System (Ammo 5) [Homing] [Empty Bin] 0 (+) 0.00 = 450,000.00
Arrow IV System (Ammo 5) [Homing] [Empty Bin] 0 (+) 0.00 = 450,000.00
Arrow IV System (Ammo 5) [Homing] [Empty Bin] 0 (+) 0.00 = 450,000.00
Arrow IV System (Ammo 5) [Non-Homing] [Empty Bin] 0 (+) 0.00 = 450,000.00
CASE 50,000 (+) 50,000.00 = 500,000.00
Guardian ECM Suite 200,000 (+) 200,000.00 = 700,000.00
LB 20-X AC 600,000 (+) 600,000.00 = 1,300,000.00
LB 20-X AC (Ammo 5) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,300,000.00
LB 20-X AC (Ammo 5) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,300,000.00
LB 20-X AC (Ammo 5) [Empty Bin] 0 (+) 0.00 = 1,300,000.00
Snub-Nose PPC 300,000 (+) 300,000.00 = 1,600,000.00
TAG 50,000 (+) 50,000.00 = 1,650,000.00
------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,650,000.00
========================================================================================================================
Combat Vehicle Cost
------------------------------------------------------------------------------------------------------------------------
Structural Cost 7,075,000.00
Weapons and Equipment Cost (+) 1,650,000.00 = 8,725,000.00
Combat Vehicle Cost Multiplier 1 + (90 / 100) (*) 1.9 = 16,577,500.00
------------------------------------------------------------------------------------------------------------------------