Cost Breakdown
Name/Model: Abrams M1A4
Technology: Inner Sphere
Tonnage: 75
Configuration: Tracked Combat Vehicle
===============================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (232 pts) 13.0 x 20,000 260,000.00
Internal Structure (Standard) 7.5 x 10,000 (+) 75,000.00 = 335,000.00
Control Components 4 x 10,000 (+) 40,000.00 = 375,000.00
Engine (Fusion) (5,000 x 300 x 75) / 75 (+) 1,500,000.00 = 1,875,000.00
Turret 2 x 5,000 (+) 10,000.00 = 1,885,000.00
---------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,885,000.00
===============================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
LB 20-X AC 600,000 (+) 600,000.00 = 700,000.00
LB 20-X AC (Ammo 5) [Cluster] [Empty Bin] 0 (+) 0.00 = 700,000.00
LB 20-X AC (Ammo 5) [Empty Bin] 0 (+) 0.00 = 700,000.00
LB 20-X AC (Ammo 5) [Empty Bin] 0 (+) 0.00 = 700,000.00
Machine Gun 5,000 (+) 5,000.00 = 705,000.00
Machine Gun 5,000 (+) 5,000.00 = 710,000.00
Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 710,000.00
---------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 710,000.00
===============================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------------
Structural Cost 1,885,000.00
Weapons and Equipment Cost (+) 710,000.00 = 2,595,000.00
Combat Vehicle Cost Multiplier 1 + (75 / 100) (*) 1.75 = 4,541,250.00
---------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 4,541,250.00
|