Cost Breakdown
Name/Model: Ashmead ASH-A4
Technology: Inner Sphere
Tonnage: 50
Configuration: Tracked Combat Vehicle
======================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (138 pts) 7.0 x 25,000 175,000.00
Internal Structure (Standard) 5.0 x 10,000 (+) 50,000.00 = 225,000.00
Control Components 2.5 x 10,000 (+) 25,000.00 = 250,000.00
Engine (XL) (20,000 x 100 x 50) / 75 (+) 1,333,333.33 = 1,583,333.33
----------------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,583,333.33
======================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------------
Arrow IV System 450,000 450,000.00
Arrow IV System 450,000 (+) 450,000.00 = 900,000.00
Arrow IV System (Ammo 5) [Fuel-Air] [Empty Bin] 0 (+) 0.00 = 900,000.00
Arrow IV System (Ammo 5) [Fuel-Air] [Empty Bin] 0 (+) 0.00 = 900,000.00
Arrow IV System (Ammo 5) [Fuel-Air] [Empty Bin] 0 (+) 0.00 = 900,000.00
----------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 900,000.00
======================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------------
Structural Cost 1,583,333.33
Weapons and Equipment Cost (+) 900,000.00 = 2,483,333.33
Combat Vehicle Cost Multiplier 1 + (50 / 100) (*) 1.5 = 3,725,000.00
----------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 3,725,000.00
|