Cost Breakdown
Name/Model: Atlatl IV AT-4L
Technology: Inner Sphere (Mixed)
Tonnage: 30
Configuration: Naval (Displacement Hull) Combat Vehicle
=============================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------
Armor (Standard) (56 pts) 3.5 x 10,000 35,000.00
Internal Structure (Standard) 3.0 x 10,000 (+) 30,000.00 = 65,000.00
Control Components 1.5 x 10,000 (+) 15,000.00 = 80,000.00
Engine (Fuel Cell) (3,500 x 60 x 30) / 75 (+) 84,000.00 = 164,000.00
Heat Sinks (Single) 1 x 2,000 (+) 2,000.00 = 166,000.00
Front Turret 0.5 x 5,000 (+) 2,500.00 = 168,500.00
Rear Turret 1.5 x 5,000 (+) 7,500.00 = 176,000.00
-------------------------------------------------------------------------------------------------------------
Total Structural Cost 176,000.00
=============================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------
AP Gauss Rifle (C) 10,000 10,000.00
AP Gauss Rifle (C) 10,000 (+) 10,000.00 = 20,000.00
AP Gauss Rifle (C) 10,000 (+) 10,000.00 = 30,000.00
AP Gauss Rifle (Ammo 40) [Empty Bin] (C) 0 (+) 0.00 = 30,000.00
Extended LRM 15 350,000 (+) 350,000.00 = 380,000.00
Extended LRM 15 (Ammo 6) [Empty Bin] 0 (+) 0.00 = 380,000.00
Extended LRM 15 (Ammo 6) [Empty Bin] 0 (+) 0.00 = 380,000.00
Lifeboat, Maritime 5,000 (+) 5,000.00 = 385,000.00
Sponson Turrets 0.5 x 4,000 (+) 2,500.00 = 387,500.00
-------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 387,500.00
=============================================================================================================
Combat Vehicle Cost
-------------------------------------------------------------------------------------------------------------
Structural Cost 176,000.00
Weapons and Equipment Cost (+) 387,500.00 = 563,500.00
Combat Vehicle Cost Multiplier 1 + (30 / 200) (*) 1.15 = 648,025.00
-------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 648,025.00
|