Cost Breakdown
Name/Model: Pincer
Technology: Inner Sphere
Tonnage: 50
Configuration: Tracked Combat Vehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (155 pts) 8.0 x 25,000 200,000.00
Internal Structure (Standard) 5.0 x 10,000 (+) 50,000.00 = 250,000.00
Control Components 2.5 x 10,000 (+) 25,000.00 = 275,000.00
Engine (XL) (20,000 x 350 x 50) / 75 (+) 4,666,666.67 = 4,941,666.67
Turret 1 x 5,000 (+) 5,000.00 = 4,946,666.67
----------------------------------------------------------------------------------------------------------------
Total Structural Cost 4,946,666.67
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
MagShot Gauss Rifle 8,500 8,500.00
MagShot Gauss Rifle (Ammo 50) [Empty Bin] 0 (+) 0.00 = 8,500.00
PPC 200,000 (+) 200,000.00 = 208,500.00
Supercharger 350 x 10,000 (+) 3,500,000.00 = 3,708,500.00
Trailer Hitch 0 (+) 0.00 = 3,708,500.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 3,708,500.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
Structural Cost 4,946,666.67
Weapons and Equipment Cost (+) 3,708,500.00 = 8,655,166.67
Combat Vehicle Cost Multiplier 1 + (50 / 100) (*) 1.5 = 12,982,750.00
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 12,982,750.00
|