Cost Breakdown
Name/Model: Mandible MAN-PDV
Technology: Inner Sphere
Tonnage: 90
Configuration: Tracked Combat Vehicle
===============================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (355 pts) 18.0 x 25,000 450,000.00
Internal Structure (Standard) 9.0 x 10,000 (+) 90,000.00 = 540,000.00
Control Components 4.5 x 10,000 (+) 45,000.00 = 585,000.00
Engine (Fusion) (5,000 x 270 x 90) / 75 (+) 1,620,000.00 = 2,205,000.00
Heat Sinks (Single) 5 x 2,000 (+) 10,000.00 = 2,215,000.00
Turret 1 x 5,000 (+) 5,000.00 = 2,220,000.00
---------------------------------------------------------------------------------------------------------------
Total Structural Cost 2,220,000.00
===============================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
CASE 50,000 (+) 50,000.00 = 150,000.00
CASE 50,000 (+) 50,000.00 = 200,000.00
Heavy Machine Gun 7,500 (+) 7,500.00 = 207,500.00
Heavy Machine Gun 7,500 (+) 7,500.00 = 215,000.00
Heavy Machine Gun 7,500 (+) 7,500.00 = 222,500.00
Heavy Machine Gun 7,500 (+) 7,500.00 = 230,000.00
Heavy Machine Gun 7,500 (+) 7,500.00 = 237,500.00
Heavy Machine Gun 7,500 (+) 7,500.00 = 245,000.00
Heavy Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 245,000.00
Heavy Machine Gun Array Module 1,250 (+) 1,250.00 = 246,250.00
Heavy Machine Gun Array Module 1,250 (+) 1,250.00 = 247,500.00
Heavy-Duty Pile Driver 100,000 (+) 100,000.00 = 347,500.00
Light PPC 150,000 (+) 150,000.00 = 497,500.00
Light PPC 150,000 (+) 150,000.00 = 647,500.00
Light PPC 150,000 (+) 150,000.00 = 797,500.00
Sponson Turrets 1 x 4,000 (+) 5,000.00 = 802,500.00
---------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 802,500.00
===============================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------------
Structural Cost 2,220,000.00
Weapons and Equipment Cost (+) 802,500.00 = 3,022,500.00
Combat Vehicle Cost Multiplier 1 + (90 / 100) (*) 1.9 = 5,742,750.00
---------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 5,742,750.00
|