Cost Breakdown
Name/Model: Mattock Battle Tank (AFFC)
Technology: Inner Sphere
Tonnage: 58
Configuration: Tracked Combat Vehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
Armor (Hardened) (56 pts) 7.0 x 15,000 105,000.00
Internal Structure (Standard) 6.0 x 10,000 (+) 60,000.00 = 165,000.00
Control Components 3 x 10,000 (+) 30,000.00 = 195,000.00
Engine (XL) (20,000 x 290 x 58) / 75 (+) 4,485,333.33 = 4,680,333.33
Heat Sinks (Single) 5 x 2,000 (+) 10,000.00 = 4,690,333.33
Turret 1.5 x 5,000 (+) 7,500.00 = 4,697,833.33
----------------------------------------------------------------------------------------------------------------
Total Structural Cost 4,697,833.33
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
Enhanced LRM 5 37,500 (+) 37,500.00 = 87,500.00
Enhanced LRM 5 (Ammo 24) [Empty Bin] 0 (+) 0.00 = 87,500.00
ER PPC 300,000 (+) 300,000.00 = 387,500.00
Guardian ECM Suite 200,000 (+) 200,000.00 = 587,500.00
MagShot Gauss Rifle 8,500 (+) 8,500.00 = 596,000.00
MagShot Gauss Rifle 8,500 (+) 8,500.00 = 604,500.00
MagShot Gauss Rifle (Ammo 50) [Empty Bin] 0 (+) 0.00 = 604,500.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 604,500.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
Structural Cost 4,697,833.33
Weapons and Equipment Cost (+) 604,500.00 = 5,302,333.33
Combat Vehicle Cost Multiplier 1 + (58 / 100) (*) 1.58 = 8,377,686.67
Environmental Sealing 8,377,686.67 x 0.25 (+) 2,094,421.67 = 10,472,108.33
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 10,472,108.00
|