Cost Breakdown
Name/Model: Vedette LBX 10
Technology: Inner Sphere
Tonnage: 50
Configuration: Tracked Combat Vehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
Armor (Standard) (128 pts) 8.0 x 10,000 80,000.00
Internal Structure (Standard) 5.0 x 10,000 (+) 50,000.00 = 130,000.00
Control Components 2.5 x 10,000 (+) 25,000.00 = 155,000.00
Engine (Fusion) (5,000 x 250 x 50) / 75 (+) 833,333.33 = 988,333.33
Turret 1.5 x 5,000 (+) 7,500.00 = 995,833.33
----------------------------------------------------------------------------------------------------------------
Total Structural Cost 995,833.33
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
LB 10-X AC 400,000 400,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 400,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 400,000.00
Machine Gun 5,000 (+) 5,000.00 = 405,000.00
Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 405,000.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 405,000.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
Structural Cost 995,833.33
Weapons and Equipment Cost (+) 405,000.00 = 1,400,833.33
Combat Vehicle Cost Multiplier 1 + (50 / 100) (*) 1.5 = 2,101,250.00
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 2,101,250.00
|