Cost Breakdown
Name/Model: Light Engineering Vehicle ENG-6R
Technology: Inner Sphere
Tonnage: 35
Configuration: Wheeled Combat Vehicle
=======================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------
Armor (Standard) (104 pts) 6.5 x 10,000 65,000.00
Internal Structure (Standard) 3.5 x 10,000 (+) 35,000.00 = 100,000.00
Control Components 2 x 10,000 (+) 20,000.00 = 120,000.00
Engine (Fusion) (5,000 x 190 x 35) / 75 (+) 443,333.33 = 563,333.33
Turret 0.5 x 5,000 (+) 2,500.00 = 565,833.33
-------------------------------------------------------------------------------------------------------
Total Structural Cost 565,833.33
=======================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------
Bulldozer 50,000 50,000.00
Cargo, Liquid (1 ton) 2 x 50 (+) 100.00 = 50,100.00
Compartment, Infantry (1.5 ton) 3 x 0 (+) 0.00 = 50,100.00
Lift Hoist 50,000 (+) 50,000.00 = 100,100.00
Lift Hoist 50,000 (+) 50,000.00 = 150,100.00
Sprayer 1,000 (+) 1,000.00 = 151,100.00
Trailer Hitch 0 (+) 0.00 = 151,100.00
-------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 151,100.00
=======================================================================================================
Combat Vehicle Cost
-------------------------------------------------------------------------------------------------------
Structural Cost 565,833.33
Weapons and Equipment Cost (+) 151,100.00 = 716,933.33
Combat Vehicle Cost Multiplier 1 + (35 / 200) (*) 1.175 = 842,396.67
-------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 842,397.00
|