Cost Breakdown
Name/Model: Marsden MBT II-A (LB-X)
Technology: Inner Sphere
Tonnage: 60
Configuration: Tracked Combat Vehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
Armor (Standard) (248 pts) 15.5 x 10,000 155,000.00
Internal Structure (Standard) 6.0 x 10,000 (+) 60,000.00 = 215,000.00
Control Components 3 x 10,000 (+) 30,000.00 = 245,000.00
Engine (Internal Combustion) (1,250 x 180 x 60) / 75 (+) 180,000.00 = 425,000.00
Turret 1.5 x 5,000 (+) 7,500.00 = 432,500.00
----------------------------------------------------------------------------------------------------------------
Total Structural Cost 432,500.00
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
LB 10-X AC 400,000 400,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 400,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 400,000.00
Machine Gun 5,000 (+) 5,000.00 = 405,000.00
Machine Gun 5,000 (+) 5,000.00 = 410,000.00
Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 410,000.00
Streak SRM 2 15,000 (+) 15,000.00 = 425,000.00
Streak SRM 2 15,000 (+) 15,000.00 = 440,000.00
Streak SRM 2 (Ammo 50) [Empty Bin] 0 (+) 0.00 = 440,000.00
Streak SRM 2 (Ammo 50) [Empty Bin] 0 (+) 0.00 = 440,000.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 440,000.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
Structural Cost 432,500.00
Weapons and Equipment Cost (+) 440,000.00 = 872,500.00
Combat Vehicle Cost Multiplier 1 + (60 / 100) (*) 1.6 = 1,396,000.00
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 1,396,000.00
|