Cost Breakdown
Name/Model: Challenger MBT XVc
Technology: Inner Sphere
Tonnage: 90
Configuration: Tracked Combat Vehicle
======================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (267 pts) 13.5 x 25,000 337,500.00
Internal Structure (Standard) 9.0 x 10,000 (+) 90,000.00 = 427,500.00
Control Components 4.5 x 10,000 (+) 45,000.00 = 472,500.00
Engine (XXL) (100,000 x 270 x 90) / 75 (+) 32,400,000.00 = 32,872,500.00
Turret 3 x 5,000 (+) 15,000.00 = 32,887,500.00
----------------------------------------------------------------------------------------------------------------------
Total Structural Cost 32,887,500.00
======================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------------
Gauss Rifle 300,000 300,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 300,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 300,000.00
MagShot Gauss Rifle 8,500 (+) 8,500.00 = 308,500.00
MagShot Gauss Rifle 8,500 (+) 8,500.00 = 317,000.00
MagShot Gauss Rifle 8,500 (+) 8,500.00 = 325,500.00
MagShot Gauss Rifle 8,500 (+) 8,500.00 = 334,000.00
MagShot Gauss Rifle (Ammo 50) [Empty Bin] 0 (+) 0.00 = 334,000.00
Silver Bullet Gauss Rifle 350,000 (+) 350,000.00 = 684,000.00
Silver Bullet Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 684,000.00
Silver Bullet Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 684,000.00
Sponson Turrets 0.5 x 4,000 (+) 2,500.00 = 686,500.00
Thunderbolt 15 325,000 (+) 325,000.00 = 1,011,500.00
Thunderbolt 15 (Ammo 4) [Empty Bin] 0 (+) 0.00 = 1,011,500.00
Thunderbolt 15 (Ammo 4) [Empty Bin] 0 (+) 0.00 = 1,011,500.00
Thunderbolt 15 (Ammo 4) [Empty Bin] 0 (+) 0.00 = 1,011,500.00
Thunderbolt 15 (Ammo 4) [Empty Bin] 0 (+) 0.00 = 1,011,500.00
----------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,011,500.00
======================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------------
Structural Cost 32,887,500.00
Weapons and Equipment Cost (+) 1,011,500.00 = 33,899,000.00
Combat Vehicle Cost Multiplier 1 + (90 / 100) (*) 1.9 = 64,408,100.00
----------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 64,408,100.00
|