Cost Breakdown
Name/Model: Archon Heavy Assault Vehicle
Technology: Inner Sphere
Tonnage: 85
Configuration: Tracked Combat Vehicle
===============================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (241 pts) 13.5 x 20,000 270,000.00
Internal Structure (Standard) 8.5 x 10,000 (+) 85,000.00 = 355,000.00
Control Components 4.5 x 10,000 (+) 45,000.00 = 400,000.00
Engine (Fusion) (5,000 x 255 x 85) / 75 (+) 1,445,000.00 = 1,845,000.00
Turret 2 x 5,000 (+) 10,000.00 = 1,855,000.00
---------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,855,000.00
===============================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------
Compartment, Infantry (0.5 ton) 1 x 0 0.00
LB 20-X AC 600,000 (+) 600,000.00 = 600,000.00
LB 20-X AC (Ammo 5) [Cluster] [Empty Bin] 0 (+) 0.00 = 600,000.00
LB 20-X AC (Ammo 5) [Empty Bin] 0 (+) 0.00 = 600,000.00
Light Gauss Rifle 275,000 (+) 275,000.00 = 875,000.00
Light Gauss Rifle (Ammo 16) [Empty Bin] 0 (+) 0.00 = 875,000.00
Machine Gun 5,000 (+) 5,000.00 = 880,000.00
Machine Gun 5,000 (+) 5,000.00 = 885,000.00
Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 885,000.00
Snub-Nose PPC 300,000 (+) 300,000.00 = 1,185,000.00
---------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,185,000.00
===============================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------------
Structural Cost 1,855,000.00
Weapons and Equipment Cost (+) 1,185,000.00 = 3,040,000.00
Combat Vehicle Cost Multiplier 1 + (85 / 100) (*) 1.85 = 5,624,000.00
---------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 5,624,000.00
|