Cost Breakdown
Name/Model: M6 Scott
Technology: Inner Sphere
Tonnage: 80
Configuration: Tracked Combat Vehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (228 pts) 11.5 x 25,000 287,500.00
Internal Structure (Standard) 8.0 x 10,000 (+) 80,000.00 = 367,500.00
Control Components 4 x 10,000 (+) 40,000.00 = 407,500.00
Engine (XL) (20,000 x 320 x 80) / 75 (+) 6,826,666.67 = 7,234,166.67
Heat Sinks (Single) 5 x 2,000 (+) 10,000.00 = 7,244,166.67
Turret 1.5 x 5,000 (+) 7,500.00 = 7,251,666.67
----------------------------------------------------------------------------------------------------------------
Total Structural Cost 7,251,666.67
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
Flamer (Vehicle) 7,500 (+) 7,500.00 = 107,500.00
Flamer (Vehicle) (Ammo 20) [Empty Bin] 0 (+) 0.00 = 107,500.00
Heavy PPC 250,000 (+) 250,000.00 = 357,500.00
Rotary AC/5 275,000 (+) 275,000.00 = 632,500.00
Rotary AC/5 (Ammo 20) [Empty Bin] 0 (+) 0.00 = 632,500.00
Rotary AC/5 (Ammo 20) [Empty Bin] 0 (+) 0.00 = 632,500.00
Streak SRM 2 15,000 (+) 15,000.00 = 647,500.00
Streak SRM 2 (Ammo 50) [Empty Bin] 0 (+) 0.00 = 647,500.00
Targeting Computer 20 x 10,000 (+) 200,000.00 = 847,500.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 847,500.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
Structural Cost 7,251,666.67
Weapons and Equipment Cost (+) 847,500.00 = 8,099,166.67
Combat Vehicle Cost Multiplier 1 + (80 / 100) (*) 1.8 = 14,578,500.00
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 14,578,500.00
|