Cost Breakdown
Name/Model: M5 Halleck
Technology: Inner Sphere
Tonnage: 55
Configuration: Tracked Combat Vehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (168 pts) 8.5 x 25,000 212,500.00
Internal Structure (Standard) 5.5 x 10,000 (+) 55,000.00 = 267,500.00
Control Components 3 x 10,000 (+) 30,000.00 = 297,500.00
Engine (XL) (20,000 x 275 x 55) / 75 (+) 4,033,333.33 = 4,330,833.33
Heat Sinks (Single) 5 x 2,000 (+) 10,000.00 = 4,340,833.33
Turret 1.5 x 5,000 (+) 7,500.00 = 4,348,333.33
----------------------------------------------------------------------------------------------------------------
Total Structural Cost 4,348,333.33
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
Heavy PPC 250,000 (+) 250,000.00 = 350,000.00
Machine Gun 5,000 (+) 5,000.00 = 355,000.00
Machine Gun 5,000 (+) 5,000.00 = 360,000.00
Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 360,000.00
MML 3 45,000 (+) 45,000.00 = 405,000.00
MML 3 (Ammo 33) [SRM] [Empty Bin] 0 (+) 0.00 = 405,000.00
MML 3 (Ammo 40) [LRM] [Empty Bin] 0 (+) 0.00 = 405,000.00
Targeting Computer 10 x 10,000 (+) 100,000.00 = 505,000.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 505,000.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
Structural Cost 4,348,333.33
Weapons and Equipment Cost (+) 505,000.00 = 4,853,333.33
Combat Vehicle Cost Multiplier 1 + (55 / 100) (*) 1.55 = 7,522,666.67
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 7,522,667.00
|