Cost Breakdown
Name/Model: M24 Prowler
Technology: Inner Sphere
Tonnage: 60
Configuration: Wheeled Combat Vehicle
=============================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------
Armor (Vehicular Stealth) (128 pts) 8.0 x 50,000 400,000.00
Internal Structure (Standard) 6.0 x 10,000 (+) 60,000.00 = 460,000.00
Control Components 3 x 10,000 (+) 30,000.00 = 490,000.00
Engine (Fusion) (5,000 x 220 x 60) / 75 (+) 880,000.00 = 1,370,000.00
Turret 2 x 5,000 (+) 10,000.00 = 1,380,000.00
-------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,380,000.00
=============================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------
Angel ECM Suite 750,000 750,000.00
Heavy Machine Gun 7,500 (+) 7,500.00 = 757,500.00
Heavy Machine Gun 7,500 (+) 7,500.00 = 765,000.00
Heavy Machine Gun 7,500 (+) 7,500.00 = 772,500.00
Heavy Machine Gun 7,500 (+) 7,500.00 = 780,000.00
Heavy Machine Gun (Ammo 50) [Empty Bin] 0 (+) 0.00 = 780,000.00
Heavy Machine Gun Array Module 1,250 (+) 1,250.00 = 781,250.00
Targeting Computer 0 x 10,000 (+) 0.00 = 781,250.00
Thunderbolt 20 450,000 (+) 450,000.00 = 1,231,250.00
Thunderbolt 20 (Ammo 3) [Empty Bin] 0 (+) 0.00 = 1,231,250.00
Thunderbolt 20 (Ammo 3) [Empty Bin] 0 (+) 0.00 = 1,231,250.00
Thunderbolt 20 (Ammo 3) [Empty Bin] 0 (+) 0.00 = 1,231,250.00
Thunderbolt 20 (Ammo 3) [Empty Bin] 0 (+) 0.00 = 1,231,250.00
-------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,231,250.00
=============================================================================================================
Combat Vehicle Cost
-------------------------------------------------------------------------------------------------------------
Structural Cost 1,380,000.00
Weapons and Equipment Cost (+) 1,231,250.00 = 2,611,250.00
Combat Vehicle Cost Multiplier 1 + (60 / 200) (*) 1.3 = 3,394,625.00
-------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 3,394,625.00
|