Cost Breakdown
Name/Model: sand blast 'em
Technology: Clan (Mixed)
Tonnage: 300
Configuration: Naval (Displacement Hull) Combat Vehicle
==================================================================================================================
Structural Cost
------------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (1090 pts) 55.0 x 25,000 1,375,000.00
Internal Structure (Standard) 30.0 x 10,000 (+) 300,000.00 = 1,675,000.00
Control Components 15 x 10,000 (+) 150,000.00 = 1,825,000.00
Engine (XXL) (100,000 x 270 x 300) / 75 (+) 108,000,000.00 = 109,825,000.00
Heat Sinks (Single) 5 x 2,000 (+) 10,000.00 = 109,835,000.00
Turret 15 x 5,000 (+) 75,000.00 = 109,910,000.00
------------------------------------------------------------------------------------------------------------------
Total Structural Cost 109,910,000.00
==================================================================================================================
Weapons and Equipment Cost
------------------------------------------------------------------------------------------------------------------
Angel ECM Suite 750,000 750,000.00
CASE 1 x 50,000 (+) 50,000.00 = 800,000.00
Improved C3 Computer (IS) 750,000 (+) 750,000.00 = 1,550,000.00
Laser Anti-Missile System 225,000 (+) 225,000.00 = 1,775,000.00
Laser Anti-Missile System 225,000 (+) 225,000.00 = 2,000,000.00
Laser Anti-Missile System 225,000 (+) 225,000.00 = 2,225,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 2,375,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 2,525,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 2,675,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 2,825,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 2,975,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 3,125,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 3,275,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 3,425,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 3,575,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 3,725,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 3,875,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 4,025,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 4,175,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 4,325,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 4,475,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 4,625,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 4,775,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 4,925,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 5,075,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 5,225,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 5,375,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 5,525,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 5,675,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 5,825,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 5,975,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 6,125,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 6,275,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 6,425,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 6,575,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 6,725,000.00
LB 2-X AC (Ammo 45) [Cluster] [Empty Bin] 0 (+) 0.00 = 6,725,000.00
LB 2-X AC (Ammo 45) [Cluster] [Empty Bin] 0 (+) 0.00 = 6,725,000.00
LB 2-X AC (Ammo 45) [Cluster] [Empty Bin] 0 (+) 0.00 = 6,725,000.00
LB 2-X AC (Ammo 45) [Cluster] [Empty Bin] 0 (+) 0.00 = 6,725,000.00
LB 2-X AC (Ammo 45) [Cluster] [Empty Bin] 0 (+) 0.00 = 6,725,000.00
LB 2-X AC (Ammo 45) [Cluster] [Empty Bin] 0 (+) 0.00 = 6,725,000.00
LB 2-X AC (Ammo 45) [Cluster] [Empty Bin] 0 (+) 0.00 = 6,725,000.00
LB 2-X AC (Ammo 45) [Empty Bin] 0 (+) 0.00 = 6,725,000.00
LB 2-X AC (Ammo 45) [Empty Bin] 0 (+) 0.00 = 6,725,000.00
LB 2-X AC (Ammo 45) [Empty Bin] 0 (+) 0.00 = 6,725,000.00
LB 2-X AC (Ammo 45) [Empty Bin] 0 (+) 0.00 = 6,725,000.00
LB 2-X AC (Ammo 45) [Empty Bin] 0 (+) 0.00 = 6,725,000.00
LB 2-X AC (Ammo 45) [Empty Bin] 0 (+) 0.00 = 6,725,000.00
LB 2-X AC (Ammo 45) [Empty Bin] 0 (+) 0.00 = 6,725,000.00
LB 2-X AC (Ammo 45) [Empty Bin] 0 (+) 0.00 = 6,725,000.00
------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 6,725,000.00
==================================================================================================================
Combat Vehicle Cost
------------------------------------------------------------------------------------------------------------------
Structural Cost 109,910,000.00
Weapons and Equipment Cost (+) 6,725,000.00 = 116,635,000.00
Combat Vehicle Cost Multiplier 1 + (300 / 200) (*) 2.5 = 291,587,500.00
------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 291,587,500.00
|