Cost Breakdown
Name/Model: CANNON
Technology: Inner Sphere (Mixed)
Tonnage: 50
Configuration: Hover Combat Vehicle
==============================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (119 pts) 6.0 x 25,000 150,000.00
Internal Structure (Standard) 5.0 x 10,000 (+) 50,000.00 = 200,000.00
Control Components 2.5 x 10,000 (+) 25,000.00 = 225,000.00
Lift/Dive Equipment 5 x 20,000 (+) 100,000.00 = 325,000.00
Engine (XXL) (100,000 x 315 x 50) / 75 (+) 21,000,000.00 = 21,325,000.00
--------------------------------------------------------------------------------------------------------------
Total Structural Cost 21,325,000.00
==============================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------------
Heavy Gauss Rifle 500,000 500,000.00
Heavy Gauss Rifle (Ammo 4) [Empty Bin] 0 (+) 0.00 = 500,000.00
Heavy Gauss Rifle (Ammo 4) [Empty Bin] 0 (+) 0.00 = 500,000.00
--------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 500,000.00
==============================================================================================================
Combat Vehicle Cost
--------------------------------------------------------------------------------------------------------------
Structural Cost 21,325,000.00
Weapons and Equipment Cost (+) 500,000.00 = 21,825,000.00
Combat Vehicle Cost Multiplier 1 + (50 / 50) (*) 2 = 43,650,000.00
--------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 43,650,000.00
|