Cost Breakdown
Name/Model: Eurus MBT E
Technology: Clan
Tonnage: 60
Configuration: Tracked OmniVehicle
==================================================================================================================
Structural Cost
------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Lamellor) (161 pts) 11.5 x 35,000 402,500.00
Internal Structure (Standard) 6.0 x 10,000 (+) 60,000.00 = 462,500.00
Control Components 3 x 10,000 (+) 30,000.00 = 492,500.00
Engine (XL) (20,000 x 300 x 60) / 75 (+) 4,800,000.00 = 5,292,500.00
Heat Sinks (Single) 2 x 2,000 (+) 4,000.00 = 5,296,500.00
Turret 2 x 5,000 (+) 10,000.00 = 5,306,500.00
------------------------------------------------------------------------------------------------------------------
Total Structural Cost 5,306,500.00
==================================================================================================================
Weapons and Equipment Cost
------------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System (Ammo 24) [Empty Bin] 0 (+) 0.00 = 100,000.00
AP Gauss Rifle 10,000 (+) 10,000.00 = 110,000.00
AP Gauss Rifle 10,000 (+) 10,000.00 = 120,000.00
AP Gauss Rifle 10,000 (+) 10,000.00 = 130,000.00
AP Gauss Rifle (Ammo 40) [Empty Bin] 0 (+) 0.00 = 130,000.00
CASE 2 x 50,000 (+) 100,000.00 = 230,000.00
ER Large Laser 200,000 (+) 200,000.00 = 430,000.00
Hyper-Assault Gauss 20 400,000 (+) 400,000.00 = 830,000.00
Hyper-Assault Gauss 20 (Ammo 6) [Empty Bin] 0 (+) 0.00 = 830,000.00
Hyper-Assault Gauss 20 (Ammo 6) [Empty Bin] 0 (+) 0.00 = 830,000.00
Hyper-Assault Gauss 20 (Ammo 6) [Empty Bin] 0 (+) 0.00 = 830,000.00
------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 830,000.00
==================================================================================================================
Combat Vehicle Cost
------------------------------------------------------------------------------------------------------------------
Structural Cost 5,306,500.00
Weapons and Equipment Cost (+) 830,000.00 = 6,136,500.00
Omni Conversion Cost 6,136,500.00 x 0.25 (+) 1,534,125.00 = 7,670,625.00
Combat Vehicle Cost Multiplier 1 + (60 / 100) (*) 1.6 = 12,273,000.00
------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 12,273,000.00
|