Cost Breakdown
Name/Model: Harrowstorm LRM Carrier
Technology: Inner Sphere (Mixed)
Tonnage: 80
Configuration: Tracked Combat Vehicle
===============================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (168 pts) 8.5 x 25,000 212,500.00
Internal Structure (Standard) 8.0 x 10,000 (+) 80,000.00 = 292,500.00
Control Components 4 x 10,000 (+) 40,000.00 = 332,500.00
Engine (Fuel Cell) (3,500 x 240 x 80) / 75 (+) 896,000.00 = 1,228,500.00
Heat Sinks (Single) 1 x 2,000 (+) 2,000.00 = 1,230,500.00
Turret 3.5 x 5,000 (+) 17,500.00 = 1,248,000.00
---------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,248,000.00
===============================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System 100,000 (+) 100,000.00 = 200,000.00
LRM 20 (Ammo 6) [Artemis IV] [Empty Bin] 0 (+) 0.00 = 200,000.00
LRM 20 (Ammo 6) [Artemis IV] [Empty Bin] 0 (+) 0.00 = 200,000.00
LRM 20 (Ammo 6) [Artemis IV] [Empty Bin] 0 (+) 0.00 = 200,000.00
LRM 20 (Ammo 6) [Artemis IV] [Empty Bin] 0 (+) 0.00 = 200,000.00
LRM 20 (Ammo 6) [Artemis IV] [Empty Bin] 0 (+) 0.00 = 200,000.00
LRM 20 (Ammo 6) [Artemis IV] [Empty Bin] 0 (+) 0.00 = 200,000.00
LRM 20 w/ Artemis IV FCS 250,000 + 100,000 (+) 350,000.00 = 550,000.00
LRM 20 w/ Artemis IV FCS 250,000 + 100,000 (+) 350,000.00 = 900,000.00
LRM 20 w/ Artemis IV FCS 250,000 + 100,000 (+) 350,000.00 = 1,250,000.00
MagShot Gauss Rifle 8,500 (+) 8,500.00 = 1,258,500.00
MagShot Gauss Rifle 8,500 (+) 8,500.00 = 1,267,000.00
MagShot Gauss Rifle (Ammo 50) [Empty Bin] 0 (+) 0.00 = 1,267,000.00
---------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,267,000.00
===============================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------------
Structural Cost 1,248,000.00
Weapons and Equipment Cost (+) 1,267,000.00 = 2,515,000.00
Combat Vehicle Cost Multiplier 1 + (80 / 100) (*) 1.8 = 4,527,000.00
---------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 4,527,000.00
|