Cost Breakdown
Name/Model: Murder Box MDB-LBL-4G
Technology: Inner Sphere
Tonnage: 100
Configuration: Tracked Combat Vehicle
=========================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (277 pts) 14.0 x 25,000 350,000.00
Internal Structure (Standard) 10.0 x 10,000 (+) 100,000.00 = 450,000.00
Control Components 5 x 10,000 (+) 50,000.00 = 500,000.00
Engine (XL) (20,000 x 200 x 100) / 75 (+) 5,333,333.33 = 5,833,333.33
---------------------------------------------------------------------------------------------------------
Total Structural Cost 5,833,333.33
=========================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------
Gauss Rifle 300,000 300,000.00
Gauss Rifle 300,000 (+) 300,000.00 = 600,000.00
Gauss Rifle 300,000 (+) 300,000.00 = 900,000.00
Gauss Rifle 300,000 (+) 300,000.00 = 1,200,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 1,200,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 1,200,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 1,200,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 1,200,000.00
---------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,200,000.00
=========================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------
Structural Cost 5,833,333.33
Weapons and Equipment Cost (+) 1,200,000.00 = 7,033,333.33
Combat Vehicle Cost Multiplier 1 + (100 / 100) (*) 2 = 14,066,666.67
---------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 14,066,667.00
|