Cost Breakdown
Name/Model: Bison MBT BSN-1A
Technology: Inner Sphere
Tonnage: 65
Configuration: Tracked Combat Vehicle
===============================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (228 pts) 11.5 x 25,000 287,500.00
Internal Structure (Standard) 6.5 x 10,000 (+) 65,000.00 = 352,500.00
Control Components 3.5 x 10,000 (+) 35,000.00 = 387,500.00
Engine (Fuel Cell) (3,500 x 260 x 65) / 75 (+) 788,666.67 = 1,176,166.67
Heat Sinks (Single) 1 x 2,000 (+) 2,000.00 = 1,178,166.67
Turret 2 x 5,000 (+) 10,000.00 = 1,188,166.67
---------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,188,166.67
===============================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
CASE 50,000 (+) 50,000.00 = 150,000.00
Heavy Machine Gun 7,500 (+) 7,500.00 = 157,500.00
Heavy Machine Gun 7,500 (+) 7,500.00 = 165,000.00
Heavy Machine Gun (Ammo 50) [Empty Bin] 0 (+) 0.00 = 165,000.00
Streak SRM 6 120,000 (+) 120,000.00 = 285,000.00
Streak SRM 6 (Ammo 15) [Empty Bin] 0 (+) 0.00 = 285,000.00
Ultra AC/10 320,000 (+) 320,000.00 = 605,000.00
Ultra AC/10 (Ammo 10) [Empty Bin] 0 (+) 0.00 = 605,000.00
Ultra AC/10 (Ammo 10) [Empty Bin] 0 (+) 0.00 = 605,000.00
---------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 605,000.00
===============================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------------
Structural Cost 1,188,166.67
Weapons and Equipment Cost (+) 605,000.00 = 1,793,166.67
Combat Vehicle Cost Multiplier 1 + (65 / 100) (*) 1.65 = 2,958,725.00
---------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 2,958,725.00
|