Cost Breakdown
Name/Model: Prefect PRF-3R
Technology: Inner Sphere
Tonnage: 75
Configuration: Biped BattleMech
=====================================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous): (224 pts) 12.5 x 20,000 250,000.00
Internal Structure (Endo Steel): 75 x 1,600 x 1 (+) 120,000.00 = 370,000.00
Myomer (Standard): 75 x 2,000 (+) 150,000.00 = 520,000.00
Engine (XL): (20,000 x 375 x 75) / 75 (+) 7,500,000.00 = 8,020,000.00
Gyro (XL): 2.0 x 750,000 (+) 1,500,000.00 = 9,520,000.00
Cockpit (Small): 175,000 (+) 175,000.00 = 9,695,000.00
Life Support: 50,000 (+) 50,000.00 = 9,745,000.00
Sensors: 75 x 2,000 (+) 150,000.00 = 9,895,000.00
Heat Sinks (Double): 13 x 6,000 (+) 78,000.00 = 9,973,000.00
Arm Actuators: 75 x ((100 x 2) + (50 x 0) + (80 x 0)) (+) 15,000.00 = 9,988,000.00
Leg Actuators: 75 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 52,500.00 = 10,040,500.00
---------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 10,040,500.00
=====================================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------------
Heavy PPC 250,000 250,000.00
Radical Heat Sink System 250,000 (+) 250,000.00 = 500,000.00
Snub-Nose PPC 300,000 (+) 300,000.00 = 800,000.00
Snub-Nose PPC 300,000 (+) 300,000.00 = 1,100,000.00
TSEMP Cannon 800,000 (+) 800,000.00 = 1,900,000.00
---------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,900,000.00
=====================================================================================================================
BattleMech Cost
---------------------------------------------------------------------------------------------------------------------
Structural Cost: 10,040,500.00
Weapons and Equipment Cost: (+) 1,900,000.00 = 11,940,500.00
BattleMech Cost Multiplier: 1 + (75 / 100) (*) 1.75 = 20,895,875.00
---------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 20,895,875.00
|